The work on Jasmine continues with finishing off the bilges.
First step, rip it all out! Then liberal use of a grinder with a wire brush to removes the surface rust, it wasn’t too bed but I feel mush happier knowing what’s under the floor now!
This is the Jenolite drying. Jenolite is a rust converter/preventor
And this is the paint drying (fan assisted).
After the the floor goes in I’m off to Harefield Marina to have her taken out of the water so I can paint her hull.
I don;t think I’ll ever get clean again!
Aquanomad
No comments:
Post a Comment